Document Library

bellXBP Refining Consultants Ltd expressly disclaims any and all liability and responsibility for undesirable consequences resulting from any act or omission taken as a result of reading the contents of these documents.

Process Safety
Catastrophic Heat Exchanger Failures - Handout
620.7 KB 1324 downloads 28-May-2017
CRU - European Site 1 - Combined Feed Exchanger Channel Head Failure
414.4 KB 403 downloads 27-May-2017
Catalyst Handling - Inert Entry Hazard Mitigation
276 KB 586 downloads 04-November-2016
GPP - Australasian Site 101 - Deethaniser Reboiler Catastrophic Failure
251.7 KB 323 downloads 04-October-2016
HCU - European Site 4 - Low Pressure Separator Explosion
257.6 KB 408 downloads 01-July-2016
VDU - N American Site 2 - Vacuum Residue Recirculation Line Rupture
279.6 KB 402 downloads 01-July-2016
FCC - N American Site 7 - Slurry Piping Pup Piece Rupture
241.6 KB 385 downloads 28-June-2016
USGP - European Site 4 - Debutaniser Drain Line Failure
232.1 KB 329 downloads 10-June-2016
FCC - European Site 59 - Flare Knockout Drum Outlet Line Rupture
495.6 KB 479 downloads 06-June-2016
NSU - N American Site 5 - Blowdown Vent Stack Vapour Cloud Explosion
283 KB 329 downloads 01-June-2016
VDU - European Site 54 - Vacuum Distillation Column Collapse
272.7 KB 579 downloads 27-May-2016
SGP - European Site 42 - Deethaniser Overhead Line Rupture
270.8 KB 331 downloads 27-May-2016
TKF - European Site 8 - Naphtha Storage Tank Full Surface Fire
192.6 KB 673 downloads 26-May-2016
CDU - N American Site 39 - Light Gas Oil Sidedraw Line Rupture
234.8 KB 336 downloads 26-May-2016
NHT - N American Site 9 - Feed-Effluent Exchanger Shell Rupture
303.3 KB 394 downloads 26-May-2016